Saturday, March 8, 2014

51xx Florence Ave.

Front entrance is 2x person door. Roll-up door loading bay in background behind for sale sign

Front entrance is 2x person door. Roll-up door loading bay in background behind for sale sign

Gated side driveway along west perimeter

Gated side driveway along west perimeter

West side middle grade level entrance (into semi-basement)

West side middle grade level entrance (into semi-basement)

West side middle grade level entrance (into semi-basement)

West side middle grade level entrance (into semi-basement)

51xx Florence Ave116 51xx Florence Ave117 51xx Florence Ave111 51xx Florence Ave113 51xx Florence Ave110

landing and stairs serve two entry-level doors behind middle-front area and beside middle-rear area.

landing and stairs serve two entry-level doors behind middle-front area and beside middle-rear area.

51xx Florence Ave108 51xx Florence Ave107 51xx Florence Ave106 51xx Florence Ave105 51xx Florence Ave104 51xx Florence Ave102 51xx Florence Ave103 51xx Florence Ave100 51xx Florence Ave101 51xx Florence Ave098 51xx Florence Ave099 51xx Florence Ave097

semi-basement level exterior beneath entry level rear (south)

semi-basement level exterior beneath entry level rear (south)

semi-basement level exterior beneath entry level rear (south)

semi-basement level exterior beneath entry level rear (south)

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

semi-basement level interior beneath entry level rear (south). boarded windows to south and west will admit good light.

Semi-basement level middle, with grade-level entry just out of frame

Semi-basement level middle, with grade-level entry just out of frame

looking south into semi-basement rear, from semi-basement middle

looking south into semi-basement rear, from semi-basement middle

Semi-basement front. Hallway to utility area at NE corner

Semi-basement front. Hallway to utility area at NE corner

Semi-basement middle, looking NE to removable 2x4 wall.

Semi-basement middle, looking NE to removable 2×4 wall.

Semi-basement front storage room with racks

Semi-basement front storage room with racks

Semi-basement front storage room with racks

Semi-basement front storage room with racks

51xx Florence Ave079 51xx Florence Ave074 51xx Florence Ave075 51xx Florence Ave076

Entry-level middleFront, looking South

Entry-level middleFront, looking South

51xx Florence Ave073

Entry-level front, looking west at doorways to (2) small offices

Entry-level front, looking west at doorways to (2) small offices

Entry-level front, looking E to door to loading bay at building NE corner

Entry-level front, looking E to door to loading bay at building NE corner

Entry-level front, looking N at 2x person door.

Entry-level front, looking N at 2x person door.

Entry-level rear. panorama shot makes 20x12 space look bigger than it is.

Entry-level rear. panorama shot makes 20×12 space look bigger than it is.

51xx Florence Ave066 51xx Florence Ave067 51xx Florence Ave068

entry-level mid-rear

entry-level mid-rear

51xx Florence Ave063 51xx Florence Ave064 51xx Florence Ave059 51xx Florence Ave060

entry-level mid-rear, looking south

entry-level mid-rear, looking south

former skylight over entry-level mid-front area

former skylight over entry-level mid-front area

51xx Florence Ave055 51xx Florence Ave056

Loading bay with roll-up door at building NE corner

Loading bay with roll-up door at building NE corner

Entry-level mid-front, stairs down to semi-basement in foreground; looking west

Entry-level mid-front, stairs down to semi-basement in foreground; looking west

51xx Florence Ave051 51xx Florence Ave052 51xx Florence Ave053 51xx Florence Ave049 51xx Florence Ave050 51xx Florence Ave045 51xx Florence Ave046 51xx Florence Ave047 51xx Florence Ave048 51xx Florence Ave042

3phase electrical service needs some safety repairs. It's on right now.

3phase electrical service needs some safety repairs. It’s on right now.

51xx Florence Ave044 51xx Florence Ave039 51xx Florence Ave040 51xx Florence Ave041 51xx Florence Ave036 51xx Florence Ave037 51xx Florence Ave038 51xx Florence Ave034 51xx Florence Ave035 51xx Florence Ave031 51xx Florence Ave032 51xx Florence Ave033 51xx Florence Ave029 51xx Florence Ave030 51xx Florence Ave026 51xx Florence Ave027 51xx Florence Ave028 51xx Florence Ave022 51xx Florence Ave023 51xx Florence Ave024 51xx Florence Ave025 51xx Florence Ave018 51xx Florence Ave019 51xx Florence Ave020 51xx Florence Ave021 51xx Florence Ave015 51xx Florence Ave016 51xx Florence Ave017 51xx Florence Ave010 51xx Florence Ave011 51xx Florence Ave012

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

51xx Florence Ave008 51xx Florence Ave009

Florence Ave. facade

Florence Ave. facade

51xx Florence Ave002

Entry-level front (N)

Entry-level front (N)

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Entry-level small office at front, building NW

Google map of building, looking N across Amtrak lines to corner of 51st and Florence at top of frame.

Google map of building, looking N across Amtrak lines to corner of 51st and Florence at top of frame.

 

Want to Buy a Building?

I’m looking for partners to buy a crazy beautiful old industrial building at 51xx Florence Ave. Asking price is $109,000.

 

It has many challenges (nearest city sewer connection is around the corner on 51st street; the building appears to have once been zoned for a dry-cleaners, and there may be toxic storage tanks buried on site…) but I might be willing to take it on with some help.

My vision as of now is:

 

Front area, entry level (the only one in the pictures with sheetrock):

This would be a laundromat operated by Wash Cycle or whatever that green company run by Gabriel Mandujano is.

 

Loading bay: 1/2 for Robert Monk Electric OR kitchen for the cafe; 1/2 for Wash Cycle laundry service.

(2) Partitioned offices at NW corner: one for Robert Monk Electric OR Wash Cycle; 2nd one for Wash Cycle.

 

 

Middle-Front area entry level:

This would be a cafe (possibly eventually a restaurant something like Gold Standard but with better food), and would be used by laundromat patrons. Patrons would have access to a west-facing deck linking the building’s two west entry-level doors (which are 6’ above grade on the side of the building), and providing “sweeping views of the Amtrak rail line, and sunsets”. Patrons would also include tenants of…

 

Giant skylight >> roof access to roof deck AND/OR solar PV and/or solar H20 arrays, AND/OR hang-dry laundry lines.

 

Tenant revenues:

Laundry tenant: $1000/mo

Robert Monk Electric: $250/mo (?)

Solar: $??

 

 

Middle-Rear area entry level:

A co-working environment along the lines of Cedar Works but more on an open office plan with a fancy conference room that can be opened/closed to the open office with giant sliding walls composed of quilt of salvaged window sash and stained glass panels. This area would include…

 

Tenant revenues:

Cafe: $1000/mo

 

Rear area entry level:

A common kitchen and 3-season garden patio/balcony looking SE and W over the Amtrak lines.

 

Tenant revenues:

(5) co-work tenants at $100-300/mo = $1000/mo

(4) hosted events/mo at $500/ea = $2,000/mo

(5) conference room rentals/mo @ $100 for 4h = $500

 

 

Semi-Basement:

* Middle and front: Bathrooms and showers serving all building tenants (including wash-cycle bicyclist employees for shift-changes)

* Rear: Possibly a paper-making operation using lint collected from the linen-service operated via the laundry facilities. Or maybe additional, bike-powered washers that form half of a fitness club. Or a common area and a couple private rooms to be part of a youth hostel that integrates with the cafe to provide food service. Tenants of the co-working open office would have discounted privileges to stay the night in the hostel.

 

* NE corner: electrical utilities (existing 200A or better 3phase power is on and connected now (although distribution equipment needs some restoration).

 

* N x NE area: micro Combined Heat and Power (mCHP) engine to supply hot tap and laundry machine water, hydronic heat, emergency electrical critical loads power; mCHP engine might also provide central tap- and heat-water for the entire block of row-homes neighboring on the west side of 51st St.

 

* Rear patio: another potentially nice place with a sweeping view of the Amtrak lines

 

Tenant revenues:

Youth hostel: $500/mo ?

OR

Paper making: ??

OR

Modest Fitness club:

20 members at $20/mo plus bonus access for other tenants  = $400/mo plus bonus access value.

 

 

TOTAL COST:

$125K Purchase and taxes, $5K roofing repairs, $30K basic plumbing, $20K heating system, $10K basic electrical restoration and ’shell’ distribution to tenant areas, $10K doors, windows, security/access systems = ~$250K

 

Additional shell fit-out costs by tenants.

 

TOTAL REVENUES:

$6,000/mo rents after 5% vacancy allowance

Licensed Electrician Robert Monk 51xx Florence Ave. Copyright Robert Monk, 2012

Source: http://www.phillylicensedelectrician.com/51xx-florence-ave/

electrician companies industrial electrician electric contracting

No comments:

Post a Comment